search the site
USCG: Always know your electrial plant’s restoration procedures
USCG has issued a safety alert to highlight the critical need for engineering personnel to be thoroughly familiar with, and trained on, the functionality of onboard electrical generation systems and emergency procedures to effectively manage a blackout.
Sector Delaware Bay recently responded to an incident involving a ship that suffered a loss of their main power supply while operating in a
restricted waterway. As a result, the ship was forced to rely solely on its emergency generator for more than an hour. The extended power loss arose because the crew lacked familiarity and training in main power restoration procedures.
Even after the emergency generator connected, multiple bridge and engine control room alarms diverted operator attention from critical navigation and ship handling tasks. It is crucial to swiftly restore a ship’s main power following a power loss and to reestablish operation of critical ship systems.
In this case, a non-audible alarm at the generator control panel required acknowledgement before the ship service generators could be restarted. This alarm was not integrated within the ship’s machinery monitoring system, causing it to be easily overlooked. The crew’s unfamiliarity with the control panel delayed their ability to identify and acknowledge this alarm, prolonging the restoration of the main power supply.